מלון החבצלת

מרכז העיר בירושלים. המלון שייבנה יהיה בעל 11 קומות מעל הקרקע המורכב משני בניינים, ביניהם מחבר גשר מקומה 9 ומקשרת מנהרה תת קרקעית. המלון יכלול שלוש קומות לשימור ביניהם קומת קרקע למסחר. שטח בנוי: 1,500 מ”ר זמן ביצוע מוערך: 32 חודשים חברת פיקוח: שיליאן הנדסה בע”מ ניהול הפרויקט: שיליאן הנדסה בע”מ שם היזם: פאי סיאם […]

THE HOUSE IN SHA’AREI CHESED

Prestigious residential building on Ussishkin Street in Jerusalem, the scope of the project is about 900 square meters. Execution of work for AI Landscapes Jerusalem Ltd.

THE HOUSE OF BEN-MAIMON

Ben Maimon 24 Jerusalem project, execution of a high standard residential and construction project that includes luxury construction with a different look. A total of 11 apartments and two floors of parking. Excavation and dipping under an existing building, including strengthening of facades for preservation. Done at 2012-2014.Built-up area: about 3,000 square metersExecution time: 24 […]

Beit Hanatziv, Jerusalem

 two 7-floor buildings, with a total of 66 apartments. Built area: approx. 9,000 square meters. Execution time: 24 months. Supervising company: Menachem Engineer. Developer name: Snow Construction. Estimated occupancy: 01/09/2020

The Arava House

A prestigious residential project measuring approximately 1,200 square meters, was completed in 2009. Beit HaArava Arnona Street, Jerusalem.

Ben Maimon 27

A luxury residential project of about 4500 square meters.

Ben Sira 6

Ben Sira 6 Project on Ben Sira 6 Jerusalem Street, this is a conservation project and the construction of a basement under an existing building and the addition of new floors above a building for preservation. Done in 2013.

Givat Shaul

Earthworks development project, paving roads, retaining walls, lighting, sewer and drainage lines, gardening and irrigation, prey room. Performed in 2011, Cordovero Street, Jerusalem.

Hatzerot Kedem Modieen

The project is located in the Birds neighborhood of Modi’in. The project includes 87 units in 14 buildings of 4 floors each.Built-up area: about 15,000 square metersExecution time: 24 monthsSupervision company: AvishatinName of the developer: Ketzot Kedem AssociationThe project is populated

Yad Sarah

Jerusalem, rehabilitation center and recovery rooms. The building to be built will be 18 stories above the ground floor and will include three parking basements and a commercial floor.Built-up area: about 30,000 square metersExecution time: 30 monthsSupervision Company: Waxman GovrinName of the developer: Yad Sara AssociationExpected occupancy: 01.01.2022